Import & procurement
Arcade Machine Landed Cost: Compare the Complete Purchase Scope
Compare mixed arcade and vending orders on the same delivered scope. Use the RFQ line sheet and sourced cost-range table to identify inclusions, exclusions and the questions still affecting your purchase.
Compare the same delivered scope
Compare arcade machine landed cost only after aligning the quoted build and delivery scope. Add necessary options and opening supplies, packing, transport and destination work to each offer using current sources. An unpriced required item stays unresolved; it should not become zero in the total.
Incoterms allocate delivery tasks, costs and risk between the contracting parties. ICC’s guidance also explains why the sales contract remains necessary. Record the chosen rule and named place beside the quotation so the logistics and commercial reviewers can compare the same delivery scope.
Start with a mixed-order RFQ line sheet
Use one line per model and configuration. A combined shipment does not make electrical inputs, consumables, payment equipment or service needs interchangeable. The four references below illustrate different questions within one equipment list; they are not a recommended package or a statement that these models share one payment system.
Swipe across to compare all columns.
| Quote line | Buyer input | Configuration to confirm | Packing and handover evidence |
|---|---|---|---|
| Compact Single Claw | Quantity, prize samples, destination and payment requirement. | Claw/prize fit, collection path and the exact payment/input build. | Installation drawing, packed dimensions/weight and agreed spare parts. |
| 21.5-Inch Compact Token Vending Kiosk | Quantity, token specification and intended sale/dispense process. | Supported token and payment setup; integration questions for the selected machines. | Complete transaction demonstration, packing data and recovery instructions. |
| Compact Semi-Automatic Cotton Candy | Quantity, staffed serving plan and intended consumables. | Operator workflow, compatible materials and destination input version. | Operating/cleaning instructions, consumable specification and packing data. |
| Automatic Phone Case Printing | Quantity, intended phone-case range and artwork workflow. | Supported cases, software/payment scope and consumable supply. | End-to-end demonstration, documented software scope and packing data. |
Replace the example lines with your shortlist. Add an exact model/configuration revision and quantities; do not combine unlike builds into a single “machines” line.
Work a transparent comparison example
Assume offer A is 10,000 currency units with 2,000 of necessary options excluded. Offer B is 11,500 with those options included. Before other costs, A is 12,000 on the aligned scope and B is 11,500. This is illustrative arithmetic, not an equipment price or a recommendation.
Add destination estimates on the same basis before choosing. Exchange rates, quote expiry and import-related costs can change the result. Keep the responsible logistics or destination source beside each of these rows so an updated figure can be traced.
Distinguish purchase cost from operating viability
Keep purchase and operating costs in two views. The landed sheet compares the equipment delivered on a named scope; the operating budget adds software, labour, consumables, service and site costs. A lower purchase price may bring a more expensive replenishment route, so both views matter.
Consider the cost of delays and unready site work without converting them into invented penalties. Record the business exposure and ask the parties to define contractual obligations. A delivery term alone does not settle all consequences of late or nonconforming equipment.
Build the cost comparison with sourced ranges
Give every necessary cost row a status: included, separately quoted, optional, excluded or unknown. Record currency, quote date, validity and the party providing the figure. “Included” needs a reference to the containing quote line so it is not counted twice. “Unknown” remains an open item even if every other row has a number.
A low-to-high range is useful only when it comes from a dated estimate or an explicit buyer planning assumption. Apply the same quantities and delivery scope to both ends. Sum priced rows to a priced subtotal; show unresolved required items beside it instead of presenting that subtotal as a complete landed total. This table supplies no tariff rate, freight rate or tax advice.
Swipe across to compare all columns.
| Cost row | Scope to specify | Evidence / estimate owner | Range or status to record |
|---|---|---|---|
| Equipment and options | Each model, configuration revision, quantity, artwork and ordered payment option. | Supplier quotation with validity and currency. | Quoted line amount; identify included options and optional extras. |
| Opening stock and spares | Consumable SKU/specification, quantity and spare-parts list. | Supplier or local consumables quote. | Quoted amount or sourced low–high estimate; keep recurring replenishment separate. |
| Packing and agreed checks | Packing type, package count, dimensions/weights and inspection scope. | Supplier/inspection scope and package list. | Included, separately quoted or unknown; name the containing quote line. |
| Freight and insurance | Route, mode, shipment basis, named delivery place and insurance scope. | Dated freight/insurance offer for the agreed packing data. | Quoted amount or sourced range; record expiry and exclusions. |
| Destination handling and import | Applicable terminal, broker and import-related charges for the destination. | Destination broker/logistics estimate and stated assumptions. | Sourced estimate/range or unknown; do not assume the delivery term covers every charge. |
| Local delivery and unloading | Receiving address, access limits, unloading equipment and responsible party. | Local carrier/receiving-party offer. | Quoted amount, included scope or unresolved access-dependent charge. |
| Installation and site preparation | Utilities, setup responsibilities and any agreed commissioning. | Site contractor/operator plan and supplier service scope. | Priced scope or unknown; keep optional improvements separate. |
| Software and service at purchase | Initial licence/setup, required access, training and any contracted service. | Written software/support offer for the selected version. | Upfront charge and exclusions; put recurring fees in the operating budget. |
Suggested comparison fields for each offer: status, low/high amount if supplied, currency, source/date, validity, cost owner and unresolved condition. Do not insert zero for unpriced required work.
Use the sheet to request comparable proposals
Send the same configuration list, destination and intended delivery scope to each quoting party. Ask them to mark every row included, excluded, optional or requiring confirmation. Retain the responses with their date and revision.
A completed cost matrix explains the price difference and shows the row still awaiting a quote. It lets the buyer compare the same configuration, supplies and delivery scope before selecting the proposal.
CHECK THE REFERENCES
Sources
- Compact Single Claw Machine reference configuration
Model reference and supplier-listed configuration.
- 21.5-Inch Compact Token Vending Kiosk reference configuration
Model reference and supplier-listed configuration.
- Compact Semi-Automatic Cotton Candy Machine reference configuration
Model reference and supplier-listed configuration.
- Automatic Phone Case Printing Vending Machine reference configuration
Model reference and supplier-listed configuration.
- ICC Incoterms rules: delivery tasks, costs and risks
Official explanation of delivery tasks, costs, risk and the scope of trade terms.
- ICC Incoterms 2020 Q&A: scope and the sales contract
Official explanation of delivery tasks, costs, risk and the scope of trade terms.
PUT THE GUIDE TO WORK
Get a quote your purchasing team can compare
Send your model list with quantities, destination and proposed delivery scope. Ask us to separate equipment, configuration, packing and agreed services, and identify the destination items needing a logistics or local quote.
Build my equipment brief


