Import & procurement

Arcade Equipment Purchase Specification: A Mixed Machine Order Sheet

Copy a per-configuration RFQ sheet for mixed arcade and vending orders. Track pilot, batch and reorder quantities, accepted samples, build changes and receiving evidence.

  • Distributors, resellers & multi-site operators
  • International

Start with one controlled line per model

A mixed arcade equipment order works best with one common purchase sheet and a separate line for every machine. Claw play, token dispensing, cotton candy service and printed cases have different supplies and outputs. The common sheet coordinates the order; the attachments define each operating offer.

Name the catalogue reference, quoted supplier model, quantity, configuration revision and supplier on each line. Attach the current quote and validity. Electrical build, payment and support can then be compared by machine rather than buried in a general statement.

Use one record for each configuration, not one total for machines

Copy the fields below for every distinct build. Repeat the line when a destination, payment reader, menu, controller or artwork change creates a different deliverable. Keep quantities tentative until the quotation and approval record are agreed; a repeat-order estimate is not a committed order.

Use statuses of buyer requirement, supplier proposal, confirmed or unanswered. Assign an owner and due point to unresolved fields. If an item changes feasibility or cost, the blank should block that decision rather than silently authorizing a substitute.

Swipe across to compare all columns.

Mixed-order specification — repeat one sheet per model and build
FieldBuyer entryEvidence to attachApproval record
Line identityLine ID: ___; catalogue reference: ___; exact supplier model: ___; revision: ___.Product link, supplier configuration sheet and dated quote.Agreed build: ___; approver/date: ___.
Quantity and destinationPilot units: ___; batch units: ___; possible reorder: ___; destination: ___.Quantities per configuration; receiving address and site constraints.Committed scope: ___; optional scope: ___.
Payment and electrical buildCurrency/token: ___; cashless request: ___; supply/plug: ___.Specific reader/controller/interface; input label; complete transaction test.Tested version: ___; unresolved compatibility: ___.
Operating attachmentPrize/recipe/consumable: ___; station/menu/software: ___; sample ID: ___.Accepted sample and complete play, vend or print record; model instructions.Accepted configuration: ___; change requiring retest: ___.
Appearance and materialsArtwork revision: ___; language: ___; finish/colour: ___.Dimensioned artwork proof and approved wording or asset reference.Approved proof: ___; approval does not replace functional testing.
Service, packing and cost scopeParts/manuals: ___; support owner: ___; packing record: ___; exclusions: ___.Parts IDs; support terms; package count/size/weights; named delivery scope.Included line: ___; separate quote: ___; unknown: ___.

This editable-by-copy template supplies fields, not a stock offer. Use the landed-cost guide to price the approved scope; this specification keeps model, version and evidence traceable.

Keep a category-specific attachment

For claw, clip and scissor prize machines, attach the accepted prize and mechanism configuration. For marble and ball skill games, attach the demonstrated play, result and reset loop. For token equipment, attach the physical token sample and payment-to-dispense test.

For food machines, attach the recipe or mix, accepted stick or cup, refill and cleaning handover, and site requirements. The CT-103 reference includes manual stick insertion and removal, while the automatic cotton candy references use stick feeding and pickup compartments. A Bear Popcorn line needs its own recipe, cup, portion and full serving trial; do not transfer cotton candy capacities or another popcorn model’s power rating to it. For phone-case printing, attach the accepted blank, artwork and compartment map. For CT-MJ330, separate nail-sticker output from ready-made press-on packs.

Control changes where they affect the order

A change row should name the old and new configuration, requester, evidence affected, price effect, schedule effect and approval owner. A substituted reader can reopen the payment test; a different retail pack can reopen dispensing acceptance. A colour proof may affect appearance without approving either of those technical changes.

When quoting parties return the same sheet, component and scope differences become easier to price. Label supported, optional and development items, and name who coordinates work across suppliers. The buyer can then see which decision changes the total or schedule.

Swipe across to compare all columns.

Pilot-to-batch approval record
Decision pointKeep with the recordChange that reopens the checkNext action
Shortlist to quoteLine ID, operating brief, required documents and unresolved facts.Different model, operating process or destination requirement.Resolve the affected specification before comparing price.
Sample to approved buildAccepted sample IDs, test scope, settings and build revision.New prize package, recipe, cup/stick or print blank.Repeat the affected complete-path test.
Approved build to batchQuantities by revision; agreed per-unit checks and sampled demonstrations.Reader/controller/software/firmware or electrical substitution.Document affected units and approve the revised evidence before release.
Dispatch to receiptUnit/serial-to-package list, inspection results, parts and document references.Unmatched unit, missing accessory, transit issue or different version.Record the discrepancy and agreed resolution against that line.
First batch to reorderLast accepted revision, service observations and replacement-part references.A discontinued component, new artwork or different customer market.Request a dated revision comparison; confirm what must be retested.

Suggested purchasing checkpoints to agree with the contracting parties. They are not claims that Arcade Supply Hub has completed a customer pilot, tested every unit or guaranteed a fixed inspection service.

Use the record at receiving and operation

Before shipment, match package records and agreed inspection evidence to the approved model lines. At receipt, identify the delivered units, software, documents, samples and parts. Operating staff should be able to find the relevant stock and support record without reconstructing the purchase conversation.

Send an initial sheet with destination, quantity and opening plan for a comparable proposal. Use the landed-cost guide for cost ownership, the freight-data guide for package measurements and the quote-request guide when the shortlist still needs refinement.

An operator can group lines by venue and the people responsible for daily tasks. A distributor should add the destination/customer group and an owner for local handover, consumables and spare parts. Shared freight can combine packages while each configuration and support obligation remains separately identifiable.

CHECK THE REFERENCES

Sources

  1. Compact Single Claw Machine reference configuration

    Model reference and supplier-listed configuration.

  2. 21.5-Inch Compact Token Vending Kiosk reference configuration

    Model reference and supplier-listed configuration.

  3. Arched Pickup Cotton Candy Vending Machine reference configuration

    Model reference and supplier-listed configuration.

  4. Automatic Phone Case Printing Vending Machine reference configuration

    Model reference and supplier-listed configuration.

  5. Nail Art Sticker Printing & Press-On Nail Vending Machine reference configuration

    Model reference and supplier-listed configuration.

  6. CT103 semi-automatic cotton candy reference workflow

    Model reference and supplier-listed configuration.

  7. Bear Popcorn Vending Machine — supplier reference

    Supplier reference for a separate popcorn recipe, cup and serving process; not a match to other manufacturers’ specifications.

Back to the top

PUT THE GUIDE TO WORK

Prepare a mixed equipment order

Send quantities by model, destination, payment requirements and configuration questions. Request one controlled quote line per machine with category-specific acceptance attachments.

Build my equipment brief

All buying guides

FROM READING TO A SHORTLIST

Full equipment collection

Reference models from our equipment collection. Confirm the configuration, availability and destination requirements in your quotation.